Introduction
The 4,247-hectare North Wedge Property is located 25 km southeast of the Cigar Lake uranium mine and was acquired by staking in 2004. Denison Mines Corp. has earned a 51% interest in the property.
2008 Program
Project operator, Denison, drilled 2 holes (336 metres) during the winter 2008 program. Although well developed structural disruption was intersected in both holes, only weakly anomalous analytical results were returned.
Quality Assurance / Quality Control
JNR's Vice-President Exploration, David L. Billard, PGeo, is the Qualified Person for the Company's Athabasca Basin uranium projects. All technical information for the projects is obtained and reported under a formal quality assurance and quality control (QA/QC) program, details of which are presented in the PDF link below.
Quality Assurance & Quality Control Program
|