|
JNR's Properties in the Athabasca Basin 306 KB, approx. 58 seconds at 56.6Kbps |
|
Using Gocad 3D Modelling 55 KB, approx. 11 seconds at 56.6Kbps |
|
Walker River Camp 87 KB, approx. 17 seconds at 56.6Kbps |
|
Walker River Crew Change 52 KB, approx. 11 seconds at 56.6Kbps |
|
Building Core Racks 81 KB, approx. 16 seconds at 56.6Kbps |
|
Logging in the Core Shack 65 KB, approx. 13 seconds at 56.6Kbps |
|
JNR's Heli-portable Drill Rig at Nob Hill 65 KB, approx. 13 seconds at 56.6Kbps |
|
JNR's Heli-portable Drill Rig at Hook Lake 67 KB, approx. 13 seconds at 56.6Kbps |
|
Sunset over Walker River 35 KB, approx. 8 seconds at 56.6Kbps |
|
Sunset over Walker Lake 63 KB, approx. 13 seconds at 56.6Kbps |
|
Bush Buddy 43 KB, approx. 9 seconds at 56.6Kbps |
|